Industrial filtration and screening

Wedge wire water intake screens

Submerged screening surfaces at a water-abstraction point, admitting water to the intake line while limiting entry of the specified debris. Geometry, location, usable area and cleaning access are reviewed together for the site.

Wedge wire water intake screen

Operating principle and configuration

Water crosses the external slotted surface and enters the outlet connected to the intake line. The screen is selected for the required abstraction duty and the surrounding water conditions, including low water level, sediment and floating or fibrous debris.

An intake screen is not selected from slot size alone. Flow distribution, submergence, clearance from the bed, usable open area and the fouled condition affect the installation. Environmental performance or aquatic-life protection must be assessed against the actual project criteria rather than inferred from the wedge wire material.

Main technical specifications for selection

Abstraction dutyMinimum, normal and maximum flow, number of operating intake units and the connection to the pumping system.
Site conditionsSource water, water-level range, minimum submergence, surrounding current and clearance from bed and nearby structures.
Debris and retentionTarget particle size, sand, suspended or floating matter, fibres and expected biological growth; define the retention objective.
Screen geometryDiameter, active length, arrangement, outlet position, connection standard and support points.
Slots and usable areaNominal opening and tolerance, wire and supports, flow distribution and provision for expected fouling.
Mechanical loadingSuction duty and differential pressure across clean and fouled surfaces, external loading and any permitted reverse cleaning.
Material and cleaningWater chemistry, corrosion and deposits; cleaning method, access for retrieval and any specifically designed backwash arrangement.
Project interfacesAvailable installation space, lifting or underwater access, pipe loads and project-specific environmental criteria and inspection requirements.

Technical arrangement

Conceptual submerged intake arrangement: water enters through the slotted surface and leaves through the intake connection. Water level, bed clearance, geometry and cleaning equipment are project-specific.Water levelTo intake lineBedBed clearance
Conceptual submerged intake arrangement: water enters through the slotted surface and leaves through the intake connection. Water level, bed clearance, geometry and cleaning equipment are project-specific.

Installation, inspection and cleaning

  • Confirm the installation level, supports, outlet connection and clearances against the approved layout before commissioning.
  • Establish a baseline for flow and pressure measurements and inspect for uneven accumulation or restricted water entry.
  • Review low-water operation, sediment buildup, fibres and biological growth when planning inspection and cleaning intervals.
  • Use only a cleaning or reverse-flow method designed for the screen. Define access and retrieval arrangements for the site before installation.