Wedge wire water intake screens
Submerged screening surfaces at a water-abstraction point, admitting water to the intake line while limiting entry of the specified debris. Geometry, location, usable area and cleaning access are reviewed together for the site.

Operating principle and configuration
Water crosses the external slotted surface and enters the outlet connected to the intake line. The screen is selected for the required abstraction duty and the surrounding water conditions, including low water level, sediment and floating or fibrous debris.
An intake screen is not selected from slot size alone. Flow distribution, submergence, clearance from the bed, usable open area and the fouled condition affect the installation. Environmental performance or aquatic-life protection must be assessed against the actual project criteria rather than inferred from the wedge wire material.
Main technical specifications for selection
| Abstraction duty | Minimum, normal and maximum flow, number of operating intake units and the connection to the pumping system. |
|---|---|
| Site conditions | Source water, water-level range, minimum submergence, surrounding current and clearance from bed and nearby structures. |
| Debris and retention | Target particle size, sand, suspended or floating matter, fibres and expected biological growth; define the retention objective. |
| Screen geometry | Diameter, active length, arrangement, outlet position, connection standard and support points. |
| Slots and usable area | Nominal opening and tolerance, wire and supports, flow distribution and provision for expected fouling. |
| Mechanical loading | Suction duty and differential pressure across clean and fouled surfaces, external loading and any permitted reverse cleaning. |
| Material and cleaning | Water chemistry, corrosion and deposits; cleaning method, access for retrieval and any specifically designed backwash arrangement. |
| Project interfaces | Available installation space, lifting or underwater access, pipe loads and project-specific environmental criteria and inspection requirements. |
Technical arrangement
Installation, inspection and cleaning
- Confirm the installation level, supports, outlet connection and clearances against the approved layout before commissioning.
- Establish a baseline for flow and pressure measurements and inspect for uneven accumulation or restricted water entry.
- Review low-water operation, sediment buildup, fibres and biological growth when planning inspection and cleaning intervals.
- Use only a cleaning or reverse-flow method designed for the screen. Define access and retrieval arrangements for the site before installation.