Wedge wire header and lateral assemblies
Slotted lateral branches connected to a central header or hub for retaining filter media and collecting or distributing liquid inside a vessel. The arrangement is matched to the vessel, treatment bed and operating flow directions.

Operating principle and configuration
A common header or hub connects the screen laterals to the vessel connection. Liquid passes through the slotted branch surfaces while the specified media are retained. A collector may receive liquid from the bed during service and distribute cleaning liquid during a permitted backwash cycle.
The full assembly determines the flow path: header size, branch length, connections, screen area and media bed all matter. Equal slot size alone does not guarantee equal flow through every branch. Service, backwash and any air-scour conditions must be specified separately.
Main technical specifications for selection
| Vessel and access | Internal diameter, bottom shape, nozzle position, support layout and clear manway opening for installation and removal. |
|---|---|
| Media bed | Media type, particle size distribution, bed depth and any supporting layers; identify the smallest particles to be retained. |
| Service flow | Normal and maximum flow, fluid properties, temperature and collection or distribution direction. |
| Header or hub | Diameter, inlet location, connection standard, branch positions and attachment to the vessel structure. |
| Laterals and slots | Number, length, diameter and spacing of branches; active length, slot opening and tolerance, wire and support profiles. |
| Cleaning duty | Permitted reverse flow, water flow and any air supply; differential pressure and loading in each operating phase. |
| Connections and seals | Threaded, flanged or removable joints, seal material, locking arrangement and access for branch replacement. |
| Material and supply scope | Liquid chemistry, cleaners and corrosion conditions; specify a complete assembly or replacement branches and the required inspection documents. |
Technical arrangement

Installation, inspection and cleaning
- Check the numbered arrangement, branch orientation and support positions against the approved assembly drawing.
- Inspect branch joints, seals and end closures before adding media. Leakage at a connection can bypass the specified slots.
- Remove fabrication debris and verify the agreed flow sequence before commissioning. Use the cleaning directions and operating limits defined for the assembly.
- During shutdown inspect slots, welds, corrosion, deformation, loose joints and supports. An individual replacement branch must match its hydraulic and mounting duty.
Related filter equipment
Request a technical review
Send the vessel drawing, internal dimensions and manway opening, media grading and bed depth, service and cleaning flows, temperature, fluid chemistry and the required connection details. For replacement branches include their positions and dimensions.